Density Loop: Difference between revisions

From Nguhcraft Wiki
Jump to navigation Jump to search
Arkonn (talk | contribs)
No edit summary
Arkonn (talk | contribs)
No edit summary
Line 49: Line 49:
| -
| -
|
|
|
|1
|
|
|-
|-
Line 55: Line 55:
| -
| -
|
|
|
|2
|
|
|-
|-
Line 61: Line 61:
| -
| -
|
|
|
|2 (1)
|Possible Transitional station to [[Enkavak]].
|Possible Transitional station to [[Enkavak]].
|-
|-
Line 67: Line 67:
| -
| -
|
|
|
|2
|
|
|-
|-
Line 73: Line 73:
| -
| -
|
|
|
|2
|
|
|-
|-
Line 79: Line 79:
| -
| -
|
|
|
|2
|
|
|-
|-
Line 85: Line 85:
| -
| -
|
|
|
|2
|
|
|-
|-
Line 91: Line 91:
| -
| -
|
|
|
|2
|
|
|-
|-
Line 97: Line 97:
|[[Bä Daras|''Bä Daras'']]
|[[Bä Daras|''Bä Daras'']]
| 18 April 2025
| 18 April 2025
|2 (2)
|3 (1)
|Transitional station, connects [[Cenrail]] Corner Line and the Density Loop.
|Transitional station, connects [[Cenrail]] Corner Line and the Density Loop.
|-
|-

Revision as of 19:27, 28 April 2025

Density Loop is a rail loop around the Sea of Density built and governed by FERRA. Once completed, Density Loop will go through 17 stops, being connected to the Corner Line at two stops: Green Transitional and Bä Daras. Seven sections are currently operational.

Stations

(Clockwise)
Country Station Date opened Number of directions/(not built yet) Notes
Keis-Spucke Administration Green Transitional → 26 April 2025 4 Transitional station without a surface exit, connects the Cenrail Corner Line and the Density Loop.
Keis-Spucke Administration Rainsten 26 April 2025 2
Ḿaro Ḿaro-Heki 25 April 2025 1 (1)
Keis-Spucke Administration Trisland not built yet (3/4) Transitional station connecting Purple Line with Density Loop.
T'anshilebs -
T'anshilebs -
T'anshilebs - 1
T'anshilebs - 2
T'anshilebs - 2 (1) Possible Transitional station to Enkavak.
T'anshilebs - 2
T'anshilebs - 2
T'anshilebs - 2
T'anshilebs - 2
T'anshilebs - 2
Wänade Bä Daras 18 April 2025 3 (1) Transitional station, connects Cenrail Corner Line and the Density Loop.
Wänade Yäzka 28 April 2025 1
Keis-Spucke Administration Syfa not built yet (4) Regional Transitional station for Keis-Spucke Administration and Yäzka.
Keis-Spucke Administration Green Transitional → 26 April 2025 4 The Density Loop closes.

In other Languages

Gallery