Density Loop: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 49: | Line 49: | ||
| - | | - | ||
| | | | ||
| | |1 | ||
| | | | ||
|- | |- | ||
| Line 55: | Line 55: | ||
| - | | - | ||
| | | | ||
| | |2 | ||
| | | | ||
|- | |- | ||
| Line 61: | Line 61: | ||
| - | | - | ||
| | | | ||
| | |2 (1) | ||
|Possible Transitional station to [[Enkavak]]. | |Possible Transitional station to [[Enkavak]]. | ||
|- | |- | ||
| Line 67: | Line 67: | ||
| - | | - | ||
| | | | ||
| | |2 | ||
| | | | ||
|- | |- | ||
| Line 73: | Line 73: | ||
| - | | - | ||
| | | | ||
| | |2 | ||
| | | | ||
|- | |- | ||
| Line 79: | Line 79: | ||
| - | | - | ||
| | | | ||
| | |2 | ||
| | | | ||
|- | |- | ||
| Line 85: | Line 85: | ||
| - | | - | ||
| | | | ||
| | |2 | ||
| | | | ||
|- | |- | ||
| Line 91: | Line 91: | ||
| - | | - | ||
| | | | ||
| | |2 | ||
| | | | ||
|- | |- | ||
| Line 97: | Line 97: | ||
|[[Bä Daras|''Bä Daras'']] | |[[Bä Daras|''Bä Daras'']] | ||
| 18 April 2025 | | 18 April 2025 | ||
| | |3 (1) | ||
|Transitional station, connects [[Cenrail]] Corner Line and the Density Loop. | |Transitional station, connects [[Cenrail]] Corner Line and the Density Loop. | ||
|- | |- | ||
Revision as of 19:27, 28 April 2025
Density Loop is a rail loop around the Sea of Density built and governed by FERRA. Once completed, Density Loop will go through 17 stops, being connected to the Corner Line at two stops: Green Transitional and Bä Daras. Seven sections are currently operational.
Stations
| Country | Station | Date opened | Number of directions/(not built yet) | Notes |
|---|---|---|---|---|
| Keis-Spucke Administration | Green Transitional → | 26 April 2025 | 4 | Transitional station without a surface exit, connects the Cenrail Corner Line and the Density Loop. |
| Keis-Spucke Administration | Rainsten | 26 April 2025 | 2 | |
| Ḿaro | Ḿaro-Heki | 25 April 2025 | 1 (1) | |
| Keis-Spucke Administration | Trisland | not built yet | (3/4) | Transitional station connecting Purple Line with Density Loop. |
| T'anshilebs | - | |||
| T'anshilebs | - | |||
| T'anshilebs | - | 1 | ||
| T'anshilebs | - | 2 | ||
| T'anshilebs | - | 2 (1) | Possible Transitional station to Enkavak. | |
| T'anshilebs | - | 2 | ||
| T'anshilebs | - | 2 | ||
| T'anshilebs | - | 2 | ||
| T'anshilebs | - | 2 | ||
| T'anshilebs | - | 2 | ||
| Wänade | Bä Daras | 18 April 2025 | 3 (1) | Transitional station, connects Cenrail Corner Line and the Density Loop. |
| Wänade | Yäzka | 28 April 2025 | 1 | |
| Keis-Spucke Administration | Syfa | not built yet | (4) | Regional Transitional station for Keis-Spucke Administration and Yäzka. |
| Keis-Spucke Administration | Green Transitional → | 26 April 2025 | 4 | The Density Loop closes. |
In other Languages
Gallery
-
Rainsten Station