Density Loop
Density Loop is a rail loop around the Sea of Density built and governed by FERRA. Once completed, Density Loop will go through 20 stops, being connected to the Corner Line at two stops: Green Transitional and Bä Daras. Seven sections are currently operational.
Stations
| Country | Station | Date opened | Number of directions/(not built yet) | Notes |
|---|---|---|---|---|
| Aprux Mexyrhat | Green Transitional → | 26 April 2025 | 4 | Transitional station without a surface exit, connecting Cenrail Corner Line with Density Loop. |
| Aprux Mexyrhat | Perhyh | 26 April 2025 | 2 | |
| Ḿaro | Ḿaro-Heki | 25 April 2025 | 1 (1) | |
| Aprux Mexyrhat | Kiakus'a | 24 May 2025 | (3) | Transitional station connecting Ⴀ-line with Density Loop. |
| T'anshilebs | Xvredi | (2) | ||
| T'anshilebs | Vasilob | (2) | ||
| T'anshilebs | Ladicad | (2) | ||
| T'anshilebs | Ocean | (2) | ||
| T'anshilebs | Erdudad | 1 (1) | ||
| T'anshilebs | Ofdaxebs | 2 | ||
| T'anshilebs | Lsotabsi | 2 | ||
| T'anshilebs | Gogili | 2 | ||
| T'anshilebs | Erśqe | 2 | ||
| T'anshilebs | Vdolabeċi | 2 | ||
| T'anshilebs | Velisi | 2 | ||
| T'anshilebs | Alk’emit’at | 2 | ||
| Wänade | Bä Daras | 18 April 2025 | 3 (1) | Transitional station connecting Cenrail Corner Line with Density Loop. |
| Wänade | Ola Damok | not built yet | 2 | |
| Wänade | Yäzka | 28 April 2025 | 1 | |
| Aprux Mexyrhat | Syfa | 25 May 2025 | (4) | Transitional station connecting Ⴃ-line with Density Looop. |
| Aprux Mexyrhat | Green Transitional → | 26 April 2025 | 4 | The Density Loop closes. |
In other Languages
Gallery
-
Perhyh Station