Klakkenbuutsch line
The Klakkenbuutsch line is a railway connecting Ŋegypt with Reimusia, Caluta, Dornwík and Hertskomestat Syndicate.
Contrary to other rails (such as Cenrail lines), the Klakkenbuutsch line is fully made of powered rails and is two blocks wide i.e. the rails are not distanced between each other.
On November 17, 2025 the ŊARN approved the Skylines Without Eyesores proposal, in order to dismiss and dismantle the Klakkenbuutsch line. Dornwík dismissed their stop on November 20, 2025.
Stations
- The line ends abruptly
- Ŋegypt
- Reimusia
- Caluta (since November 16, 2025 - line ends here)
- Dornwík (disconnected since November 20, 2025)
- Nieuw Antwerpen (line ends here)
- Hertskomestat Syndicate
- Neryu City