Ŋibraltar: Difference between revisions

From Nguhcraft Wiki
Jump to navigation Jump to search
m (changed the completion date to *18 July*, the date of the ceremony.)
(added arodjun name)
Line 1: Line 1:
{{Infobox ngation
{{Infobox ngation
|name=Territory of Ŋibraltar <br> Territorium Ŋibraltar <br> Gristô Ŋibraltęne''
|name=Territory of Ŋibraltar <br> Territorium Ŋibraltar <br> K'ix Njibrautarbwa <br> Gristô Ŋibraltęne''
|ung-member=no
|ung-member=no
|flag=ngibraltar-flag.png
|flag=ngibraltar-flag.png
Line 13: Line 13:
|ruler=[[Marcy Sheikah]] and [[Agma Schwa]]
|ruler=[[Marcy Sheikah]] and [[Agma Schwa]]
|ruler-title=Governors
|ruler-title=Governors
|languages=English, German, [[Kyawcenni language|Kyawcenni]], [[Arodjun]]
|languages=English, German, [[Arodjun]], [[Kyawcenni language|Kyawcenni]]
|currency=[[Petrified Oak Slab|POS]]
|currency=[[Petrified Oak Slab|POS]]
}}
}}

Revision as of 19:58, 27 August 2024

Territory of Ŋibraltar
Territorium Ŋibraltar
K'ix Njibrautarbwa
Gristô Ŋibraltęne
Location of Ŋibraltar
Capital cityŊibraltar
DemonymŊibraltarian
GovernmentCondominium between the Kingdom of Kyaw Cen and Xarslasja
Governors: Marcy Sheikah and Agma Schwa
Official languagesEnglish, German, Arodjun, Kyawcenni
CurrencyPOS
Ŋibraltar
Ŋibraltar

Ŋibraltar (colloquially shortened to Ngibs) is a condominium between the Kingdom of Kyaw Cen and the Bezuvate of Xarslasja established on 01 July 2024. Its complete urbanization and terraforming was dubbed Marcy's secret Megaproject, whose planning was completed on 09 July 2024. It started construction the day after and was completed on 18 July 2024. As of 21 July, it has a population of 13 residents.

History

Early History

Ever since the day of the server's creation, it was in Agma Schwa's interest to name a place Ŋibraltar[2], but no place with that name had ever been properly established.
The establishment of a small Kyawcenni outpost in modern-day Xarslasja has been considered ever since early 2024.[3]

Condominium

On 1 July 2024, Quing Marcy I of Kyaw Cen has proposed the idea of acquiring the peninsula to Agma Schwa, the Bezuv of Xarslasja. A compromise was reached on the same day, making Ŋibraltar a Kyawcenni-Xarslasjunk condominium.

Urbanization

A few days after the founding of Ŋibraltar, Marcy I had been planning the future layout of the city secretly in only two days (8–9 July 2024) and the city officially began construction the day after the planning was finished. Her plan was to finish building the city in only a week.

Day 1

On Day 1 (10 July), Marcy has built the underwater foundation of the future city, removed the top part of the old peninsula and finished constructing North Ŋibraltar, including the border, entrance, Northern Pier, Tourist Information Center and Cenrail® station (not including the actual rail connection).

Day 2

On Day 2 (11 July), Marcy has removed all remains of the old peninsula and finished building West Ŋibraltar, which is made up of Port Ŋibraltar, the Storridge Bildiŋ, the Bench Place, house 4 and town hall.

Day 3

On Day 3 (12 July), Marcy has finished building East Ŋibraltar, which consists of the Corner Hotel and the New Café Kesh. She wasn't able to continue building the day after due to her not being home.

Day 4

On Day 4 (14 July), Marcy has finished building South Ŋibraltar: Thasusa Point and the Ŋibraltar Fish building. She has built the flagpole, but not yet the flag, because she wanted to do that during the planned opening ceremony. She has also built a basement of the storage buidling for the clay and cactus farms and made improvements to the map on the city's entrance by marking notable sites and buidlings with banners, whose colors align with the color scheme of Kozdenen's map.
Marcy has planned on making a lof of signs in the city glow with glow ink sacs, so she tried building a glow squid farm in Port Marcy. But in an unexpected turn of events, Namnak Xhesas made her realize she had followed an outdated YouTube tutorial and the farm didn't work. Marcy was too tired to build a new farm on the same day, so she decided to end the day there.

Day 5

On Day 5 (15 July), Marcy has finished building the Cenrail line to Port Marcy, together with Pleb. While building the tunnel, Marcy has encountered several water caves with glow squids, whose ink sacs could be used for the signs in the city. On that same day, Pleb and Agma Schwa have seen the newly built town for the first time. The bezuv also announced that he was going to build a street from Yuɱa there.

Day 6

On Day 6 (16 July), Marcy has supplied the stores like the New Café Kesh, Corner Hotel and Ŋibraltar Fish with the necessary supplies and food. After that, she has populated the territory with parrots, dogs and cats from West Marcyland, Shingtsun and Nāroňpār respectively. Then she built firework cannons in the water and prepared for the opening ceremony, finally completing the city on the planned date.

Day 7

On Day 7 (17 July), the opening ceremony for Ŋibraltar was scheduled at 8pm UTC, but due to Agma Schwa not having confirmed his presence yet, the ceremony was postponed until further notice.

Day 8

Ad for the Ŋibraltar Opening Ceremony designed by Marcy Sheikah.
Ad for the Ŋibraltar Opening Ceremony designed by Marcy Sheikah.

On Day 8 (18 July), the opening ceremony for Ŋibraltar finally took place at 8pm UTC. Originally, Marcy wanted Agma Schwa to be present at the ceremony for the whole time, but due to unfortunate time zones and working hours, this turned out to be harder than expected, which resulted in Agma not being planned in for the ceremony. Nevertheless, Agma has made a surprise visit to the city during the opening ceremony for about 60 seconds.
The opening ceremony started with Marcy giving a speech about the history of the territory. Then, she gave the visitors a tour through the city from North to South and when arriving at Thasusa Point, she has hoised the flag of Ŋibraltar while playing the Cats disc on a jukebox. After that, she officially opened up the buffet and the ceremony ended.

See also

Notes and References