RTS Loop: Difference between revisions
| Line 156: | Line 156: | ||
| [[Plána Diabolórum]], [[Vallis Draconum]] | | [[Plána Diabolórum]], [[Vallis Draconum]] | ||
| VDP | | VDP | ||
| | | 14 September 2025 | ||
| Has a Nether roof portal. | | Has a Nether roof portal. | ||
|- | |- | ||
Latest revision as of 02:32, 8 October 2025

The RTS Loop, officially the Rauratoshan Loop, is a subway system in Rauratoshan built over the course of its first three months as a ŋation. It also connects, indirectly or directly, to the Coastal and Ŋafrican Cenrail lines and the Leshrail.
The organization in charge of the subway system is referred to as the RTS Loop team, and it is a subgroup of the Rauratoshan Transportation Commission. The RTS Loop team maintains the Rauratoshan Loop itself, as well as any offshoots of the Loop that are developed. The Elemental Metro and Hydra Line are primarily managed by groups that technically are not part of the bureaucracy of Rauratoshan, but the RTS Loop team does help maintain these lines too.
Timeline
- November 29, 2024: The Rauratoshan Loop begins in Remulapola.
- December 8: The Rauratoshan Loop is extended eastward to Azeria.
- December 19: The Rauratoshan Loop is extended westward to Irisela Island.
- December 21: The Rauratoshan Loop is extended and eastward to Elemental City.
- December 31: The Rauratoshan Loop is extended westward to Ruviyatangan.
- January 15, 2025: The Rauratoshan Loop is extended westward to New Motostoke.
- April 11, 2025: Construction on the Sugar Line begins, connecting Irisela Island to Dip(a)lomacy Corner.
- May 16, 2025: Construction on the Hydra Line begins, connecting Elemental City to Conclave Periculorum.
Planned additions:
- Sugar Line: Dip(a)lomacy Corner to Rasórabong
- Hydra Line: Conclave Periculorum to Vallis Ignium
- Fallen Line: Azeria to Elemental City (through Fallenarbor Town)
Connections

The Rauratoshan Loop's stations are connected in a large circular shape, much like the Cenrail Southern Line. This ensures that it is simple to get to every station on the loop.
Unlike the official Cenrail, the Rauratoshan Loop uses a different thematic color for each station. These are labeled in the same sequence as the rainbow. This is for accessibility purposes.
Rauratoshan Loop connections
| Stop | Code | Date opened | Notes | |
|---|---|---|---|---|
| Remulapola, Naho Island | RAR | 29 November 2024 | Upstairs is the Cenrail station. | |
| Astona Hill, Rafi Island | RAH | 8 December 2024 | ||
| Azeria Downtown, Rekalekatana | RAZ | 8 December 2024 | Also holds the Leshrail/Fallen Line station; elsewhere in Azeria is another Cenrail stop. | |
| Lígatal, Rekalekatana | RAL | 21 December 2024 | ||
| Elemental City, Elemental District | RAE | 21 December 2024 | Elsewhere in Elemental City is a Cenrail stop. Connects to the Hydra Line. | |
| New Motostoke, Elemental District | RAO | 15 January 2025 | ||
| Ruviyatangan, Murya Island | RAY | 31 December 2024 | Named for Murya Island. | |
| Irisela Island | RAI | 19 December 2024 | Connects to the Sugar Line. |
Sugar Line connections
| Stop | Code | Date opened | Notes | |
|---|---|---|---|---|
| Irisela Island | RAI | 19 December 2024 | Connects to the Rauratoshan Loop. | |
| Dip(a)lomacy Corner, Naho Island | RAD | 11 April 2025 | ||
| Rasórabong, New Kairi District | RAB | 26 June 2025 | ||
| Midnights Era, Port of Eras | PEM | incomplete |
Hydra Line connections
| Stop | Code | Date opened | Notes | |
|---|---|---|---|---|
| Lilac Forest, Elemental District | RAF | incomplete | ||
| Elemental City, Elemental District | RAE | 21 December 2024 | Elsewhere in Elemental City is a Cenrail stop. Connects to the Rauratoshan Loop. | |
| Conclave Periculorum | RAP | 16 May 2025 | ||
| Vallis Ignium, Vallis Draconum | VDI | 26 June 2025 | Upstairs is a Cenrail stop. Connects to the Vallis Ignium local shuttle. | |
| Plána Diabolórum, Vallis Draconum | VDP | 14 September 2025 | Has a Nether roof portal. | |
| Mare Tranquillum, Vallis Draconum | VDT | incomplete |
Fallen Line connections
| Stop | Code | Date opened | Notes | |
|---|---|---|---|---|
| Azeria (Nether) | N-RAZ | 21 December 2024 | ||
| Malachite Castle | 17 June 2024 | |||
| Fallenarbor Town | incomplete | |||
| Island of :hotspot: | incomplete |
Overview of Rauratoshanian transit

There are presently plans to build a shuttle between Elemental City's Cenrail station and the Rauratoshan Loop station, known as the "Elemental Crossing."
There are four lines that are direct offshoots of the Rauratoshan Loop, which are in varying stages of completion:
- Fallen Line: Planned to run through the Nether, connecting Azeria and Elemental City. The town planned to be around the main body of the Fallen Line is Fallenarbor Town. It will connect indirectly to the Leshrail, but will be considered a local rail rather than a Leshrail offshoot. Currently, this line has yet to be surveyed.
- Sugar Line: Planned to connect New Kairi Island to the rest of Rauratoshan, and from there to Midnights Era, Port of Eras. Will run from Irisela Island. Currently, this line is partially complete.
- Hydra Line: Planned to connect Elemental City to Vallis Draconum. Currently, this line is partially complete.
- Lemnis Line: Planned to connect the equally-planned New Lemnis City to the rest of Rauratoshan. Will likely connect to either Lígatal or Azeria.
Note that even though the Sugar and Hydra lines are international, they are not part of Cenrail. Rather, they are considered part of the Ŋafrican Association of Rail Networks.
Non-usable lines
| Stop | Code | Date opened | Notes | |
|---|---|---|---|---|
| Lígatal, Rekalekatana | RAL | 21 December 2024 | Connects to the Rauratoshan Loop. | |
| New Lemnis City | (RA8) | incomplete |
| Stop | Code | Date opened | Notes | |
|---|---|---|---|---|
| Malachite Palace | 21 December 2024 | |||
| Fallenarbor Town | incomplete | |||
| Infernal Pass (Elemental exit) | incomplete | Leads to Elemental City through an unsupported nether portal. | ||
| Infernal Pass (Island of |
1 December 2024 | Leads to Island of |