Ŋibraltar: Difference between revisions
m (→Day 2) |
m (→Day 4) |
||
Line 38: | Line 38: | ||
She wasn't able to continue building the day after due to her not being home. | She wasn't able to continue building the day after due to her not being home. | ||
====Day 4==== | ====Day 4==== | ||
On Day 4 (14 July), Marcy has finished building South Ŋibraltar: Thasusa Point and the Ŋibraltar Fish building. She has built the flagpole, but not yet the flag, because she wanted to do that during the planned opening ceremony. She has also built a basement of the storage buidling for the clay and cactus farms and made improvements to the map on the city's entrance by marking | On Day 4 (14 July), Marcy has finished building South Ŋibraltar: Thasusa Point and the Ŋibraltar Fish building. She has built the flagpole, but not yet the flag, because she wanted to do that during the planned opening ceremony. She has also built a basement of the storage buidling for the clay and cactus farms and made improvements to the map on the city's entrance by marking notable sites and buidlings with banners, whose colors align with the color scheme of [[Kozdenen]]'s map.<br> | ||
Marcy has planned on making a lof of signs in the city glow with glow ink sacs, so she tried building a glow squid farm in [[Port Marcy]]. But in an unexpected turn of events, [[Namnak Xhesas]] made her realize she had followed an outdated YouTube tutorial and the farm didn't work. Marcy was too tired to build a new farm on the same day, so she decided to end the day there. | Marcy has planned on making a lof of signs in the city glow with glow ink sacs, so she tried building a glow squid farm in [[Port Marcy]]. But in an unexpected turn of events, [[Namnak Xhesas]] made her realize she had followed an outdated YouTube tutorial and the farm didn't work. Marcy was too tired to build a new farm on the same day, so she decided to end the day there. | ||
Revision as of 12:20, 15 July 2024
Territory of Ŋibraltar Territorium Ŋibraltar Gristô Ŋibraltęne | |||||||
---|---|---|---|---|---|---|---|
| |||||||
Location of Ŋibraltar | |||||||
Capital city | Ŋibraltar | ||||||
Demonym | Ŋibraltarian | ||||||
Government | Condominium between the Kingdom of Kyaw Cen and Xarslasja Governors: Marcy Sheikah and Agma Schwa | ||||||
Official languages | English, German, Kyawcenni, Arodjun | ||||||
Currency | POS |
Ŋibraltar[2] is a condominium between the Kingdom of Kyaw Cen and the Bezuvate of Xarslasja established on 01 July 2024. Its complete urbanization and terraforming was dubbed Marcy's secret Megaproject, whose planning was completed on 09 July 2024. It started construction the day after and is expected to be completed around 16 July 2024.
History
Early History
Ever since the day of the server's creation, it as in Agma Schwa's interest to name a place Ŋibraltar[3], but no place with that name had ever been properly established.
The establishment of a small Kyawcenni outpost in modern-day Xarslasja has been considered ever since early 2024.[4]
Condominium
On 1 July 2024, Quing Marcy I of Kyaw Cen has proposed the idea of acquiring the peninsula to Agma Schwa, the Bezuv of Xarslasja. A compromise was reached on the same day, making Ŋibraltar a Kyawcenni-Xarslasjunk condominium.
Urbanization
A few days after the founding of Ŋibraltar, Marcy I had been planning the future layout of the city secretly in only two days (8–9 July 2024) and the city officially began construction the day after the planning was finished. Her plan was to finish building the city in only a week.
Day 1
On Day 1 (10 July), Marcy has built the underwater foundation of the future city, removed the top part of the old peninsula and finished constructing North Ŋibraltar, including the border, entrance, Northern Pier, Tourist Information Center and Cenrail® station (not including the actual rail connection).
Day 2
On Day 2 (11 July), Marcy has removed all remains of the old peninsula and finished building West Ŋibraltar, which is made up of Port Ŋibraltar, the Storridge Bildiŋ, the Bench Place, house 4 and town hall.
Day 3
On Day 3 (12 July), Marcy has finished building East Ŋibraltar, which consists of the Corner Hotel and the New Café Kesh. She wasn't able to continue building the day after due to her not being home.
Day 4
On Day 4 (14 July), Marcy has finished building South Ŋibraltar: Thasusa Point and the Ŋibraltar Fish building. She has built the flagpole, but not yet the flag, because she wanted to do that during the planned opening ceremony. She has also built a basement of the storage buidling for the clay and cactus farms and made improvements to the map on the city's entrance by marking notable sites and buidlings with banners, whose colors align with the color scheme of Kozdenen's map.
Marcy has planned on making a lof of signs in the city glow with glow ink sacs, so she tried building a glow squid farm in Port Marcy. But in an unexpected turn of events, Namnak Xhesas made her realize she had followed an outdated YouTube tutorial and the farm didn't work. Marcy was too tired to build a new farm on the same day, so she decided to end the day there.
See also
Notes and References
- ↑ Aspect ratio = 13:30
- ↑ Often shortened to “Ŋib” colloquially
- ↑ https://youtu.be/jPs0q8X_CuQ?t=6102
- ↑ https://discord.com/channels/697450809390268467/767569743229747220/1233170319838023774