Nogales-Arcosanti Line: Difference between revisions
Jump to navigation
Jump to search
(map) |
mNo edit summary |
||
Line 1: | Line 1: | ||
[[File:N-A Line.png|thumb|The N/A Line as of July 15th, with the dashed section still as-of-yet not complete.]] | [[File:N-A Line.png|thumb|The N/A Line as of July 15th, with the dashed section still as-of-yet not complete.]] | ||
The Nogales-Arcosanti Line, often stylized in English as "The N/A," is an internal, one-lane rail line system in [[Xarslasja]] under construction as of July 2024, which will connect [[Payson]] to [[Blythe]] via a line that passes through the southwest hinterlands of the Bezuvate's territory. | The Nogales-Arcosanti Line, often stylized in English as "The N/A," is an internal, one-lane rail line system in [[Xarslasja]] under construction as of July 2024, which will connect [[Payson]] to [[Blythe]] via a line that passes through the southwest hinterlands of the Bezuvate's territory. | ||
[[File:Nogales Bridge.png|thumb|The Nogales Bridge in July 2024]] | |||
As the largest infrastructure project in Xarslasja's history (so far), the line contains several notable sites, including the Gila River Bridge and the famous [[Nogales Bridge]]. | |||
==Stations== | ==Stations== |
Revision as of 15:37, 15 July 2024

The Nogales-Arcosanti Line, often stylized in English as "The N/A," is an internal, one-lane rail line system in Xarslasja under construction as of July 2024, which will connect Payson to Blythe via a line that passes through the southwest hinterlands of the Bezuvate's territory.

As the largest infrastructure project in Xarslasja's history (so far), the line contains several notable sites, including the Gila River Bridge and the famous Nogales Bridge.