'''Project Phoeŋix-Oressia''', natively known as '''Xemiuhbæzdci''', is an ongoing project started by Oressian president [[User:Oresttheproto|Orest I (oresttheproto)]] on July 2nd, 2024 to construct a new [[Cenrail]] line from [[Phoeŋix]] to [[Oressia]] connecting the country to the railway network. With the construction of the Oressian Transversal line, two new stations will also be built: a station in Oressia and a station in [[Guam 2]], a notable spot to do with [[Nguhcraft Spring]]. The entire new tunnel is split into 3 sections, all three respectively named Section 1, Section 2 and Section 3, with Section 1 being the shortest one. Each section is separated by a turn, so Section 1 separates [[Phoeŋix]] and the 1st turn, Section 2 separates turns 1 & 2 whilst also being split by the Guam2 station and Section 3 separates turn 2 and [[Oressia]]. Section 1 is an underground tunnel, whilst Section 2 and Section 3 were ultimately decided to be bridges to cut costs and time spent.
'''Project Phoeŋix-Oressia''', natively known as '''Xemiuhbæzdci''', is an ongoing project started by Oressian president [[User:Oresttheproto|Orest I (oresttheproto)]] on July 2nd, 2024 to construct a new [[Cenrail]] line from [[Phoeŋix]] to [[Oressia]] connecting the country to the railway network. With the construction of the Oressian Transversal line, two new stations will also be built: a station in Oressia and a station in [[Guam 2]], a notable spot to do with [[Nguhcraft Spring]]. The entire new tunnel is split into 3 sections, all three respectively named Section 1, Section 2 and Section 3, with Section 1 being the shortest one. Each section is separated by a turn, so Section 1 separates [[Phoeŋix]] and the 1st turn, Section 2 separates turns 1 & 2 whilst also being split by the Guam2 station and Section 3 separates turn 2 and [[Oressia]]. Section 1 is an underground tunnel, whilst Section 2 and Section 3 were ultimately decided to be bridges to cut costs and time spent.


Line 8: Line 9:
* July 7th, 2024: Project is postponed.
* July 7th, 2024: Project is postponed.
* July 16th, 2024: Project is resumed. Section 1 was fitted with cobblestone lining and lanterns for lighting.
* July 16th, 2024: Project is resumed. Section 1 was fitted with cobblestone lining and lanterns for lighting.
* July 17th, 2024: The construction of the first bridge from [[Phoeŋix]] to [[Guam 2]] begins.
* [[File:Isombridge1.png|thumb|Isometric view of Bridge 1.]]July 17th, 2024: The construction of the first bridge from [[Phoeŋix]] to [[Guam 2]] begins. Construction of the bridge concludes the same day.

Revision as of 17:32, 17 July 2024

Progress map of Project Phoeŋix-Oressia as of July 4th, 2024.
Start of Bridge 1.

Project Phoeŋix-Oressia, natively known as Xemiuhbæzdci, is an ongoing project started by Oressian president Orest I (oresttheproto) on July 2nd, 2024 to construct a new Cenrail line from Phoeŋix to Oressia connecting the country to the railway network. With the construction of the Oressian Transversal line, two new stations will also be built: a station in Oressia and a station in Guam 2, a notable spot to do with Nguhcraft Spring. The entire new tunnel is split into 3 sections, all three respectively named Section 1, Section 2 and Section 3, with Section 1 being the shortest one. Each section is separated by a turn, so Section 1 separates Phoeŋix and the 1st turn, Section 2 separates turns 1 & 2 whilst also being split by the Guam2 station and Section 3 separates turn 2 and Oressia. Section 1 is an underground tunnel, whilst Section 2 and Section 3 were ultimately decided to be bridges to cut costs and time spent.

Timeline

  • July 2nd, 2024: The project is started.
  • July 4th, 2024: Excavation of Section 1 is completed. Construction of Section 2 started later that day.
  • July 7th, 2024: Project is postponed.
  • July 16th, 2024: Project is resumed. Section 1 was fitted with cobblestone lining and lanterns for lighting.
  • Isometric view of Bridge 1.
    July 17th, 2024: The construction of the first bridge from Phoeŋix to Guam 2 begins. Construction of the bridge concludes the same day.