Nogales-Arcosanti Line

The Nogales-Arcosanti Line, often stylized in English as "The N/A," is an internal, one-lane rail line system in Xarslasja under construction as of July 2024, which will connect Payson to Blythe via a line that passes through the southwest hinterlands of the Bezuvate's territory.

As the largest infrastructure project in Xarslasja's history (so far), the line contains several notable sites, including the Gila River Bridge and the famous Nogales Bridge.